project info
Anno2019
LocationSanta Maria di Sala (VE)

Piovan Group is a global leader in the supply of auxiliary equipment, engineered solutions, and services for the plastics industry. For the construction of the new production hub, Tesi System supplied all prefabricated reinforced concrete structural elements, the enclosure panels with a smooth formwork finish, and the roofing system. In addition, Tesi System was responsible for the construction of the external fire-escape steel staircase.

TECHNOLOGY:
ALAR – Reinforced concrete shell slab

AREA:
8,000 m² + 7,500 m² total – 150 m² floor slab

HEIGHT:
12.50 m