Pianca S.p.A. is a well-established and leading Italian industrial company operating in the home furniture systems and accessories sector.
For the construction of the new production facility, Tesi System was responsible for several key phases of the project: from site preparation and foundation works to the supply and installation of prestressed (CAP) and vibrated (CAV) reinforced concrete prefabricated elements. The scope of work also included the preparation of sub-bases and the installation of the internal flooring.


















