C.C.T. Inox has specialized in the production of stainless steel pipes since 1996. For the construction of the new industrial hub, Tesi System supplied all prefabricated reinforced concrete structural elements, the enclosure panels with a bush-hammered marble aggregate finish, and the roofing system with provisions for the installation of a photovoltaic system.
TECHNOLOGY:
V-SYSTEM – Reinforced concrete shell slab
AREA:
2,800 m² total – 1,450 m² floor slab
HEIGHT:
7.35 m
















