project info
Anno2018
LocationNervesa della Battaglia (TV)

AirCom S.r.l. has been operating since 1971 and has grown and established itself worldwide through the production of accessories for air extraction and purification systems, as well as low-capacity silent compressors. For the construction of the new production and headquarters facility, Tesi System supplied all prefabricated reinforced concrete structural elements, the roofing system, and the enclosure panels with the following finishes: polished marble aggregate, washed river gravel, and smooth formwork finish.

TECHNOLOGY:
V-SYSTEM – Reinforced concrete shell slab

AREA:
5,730 m² total – 841 m² of TT floor slabs

HEIGHT:
9.00 m