project info
Anno2017
LocationCastel d'Azzano (VR)

Casagrande Elettrocostruzioni has been a leading company in the electromechanical sector since 1959. For the expansion of its production plant in Verona, Tesi System supplied all prefabricated reinforced concrete structural elements, the enclosure panels with a smooth formwork finish, and the roofing system.

TECHNOLOGY:
ALAR – Sandwich shell slab

AREA:
4,830 m² total – 1,450 m² floor slab

HEIGHT:
9.5 m