Calzaturificio Caravelle has been operating since 1962 and enjoys worldwide recognition for the quality of its footwear. For the construction of the new production facility, Tesi System supplied all prefabricated reinforced concrete structural elements, the enclosure panels with a smooth formwork finish featuring simulated joints, and the roofing system.
TECHNOLOGY:
SYNTESI
AREA:
2,370 m² total – 254 m² floor slab
HEIGHT:
4.60 m


















